ROAD AND TRAFFIC INDEX
Lemery, Batangas
LEMERY, BATANGAS
SURVEYED PAVEMENT DISTRESS IN BONIFACIO STREET
Defect(s)/Deficiencies Estimated Quantity Unit of Measure Remarks Length Width Depth No. of Slab Latitude Longitude
Total: 193
Minor Wornout Surface 83.7 sq.m 1 13.87907 120.912252
Pothole (Chuck) 0.423 sq.m 94 cm 45 cm 1 cm 3 13.879084 120.912014
Major Wornout 948.6 sq.m 5 13.879069 120.911854
38 13.879292 120.912224
Broken Humps 3.6 sq.m 6 m 0.6 m 21 13.87927 120.912033
Wornout and Popouts 27.9 sq.m 27 13.879629 120.912364
Minor Wornout 306.9 sq.m 39 13.879854 120.912739
49 13.880118 120.913198
Major Popouts 251.1 sq.m 49 13.880118 120.913198
57 13.879421 120.912712
Sangalang St/In 57 13.879421 120.912712
Potholes (edge break) 0.124 sq.m 6.2 m 2 cm 9 cm 58 13.880306 120.913464
Major Wornout 167.4 sq.m 58 13.880306 120.913464
63 13.880488 120.913677
Potholes 0.799 sq.m 1.7 m 0.47 m 5 cm 60 13.87947 120.91282
Filipinismo St/Co 70 13.880542 120.913863
Minor Wornout surface 558 sq.m 64 13.880407 120.913633
M.H. Del Pilar St/In 83 13.879411 120.912885
Major Wornout 641.7 sq.m 84 13.880905 120.9144
106 13.881326 120.915098
Longitudinal crack 11.1 l.m 11.10 m 5 cm 86 13.880943 120.9144
Independecia/In 97 13.881191 120.91482
Ilustre Ave./In 106 13.881326 120.915098
Major Wornout surface 195.3 sq.m 107 13.881134 120.915504
113 13.881544 120.915442
Transverse Crack 6.2 l.m 6.2 m 23 cm 115 13.881571 120.915484
Potholes 5.52 sq.m 2.3 m 1.2 m 118 13.881601 120.91555
120 13.88178 120.915597
Atienza St/In 129 13.881868 120.915941
Scaling 27.9 sq.m 129 13.881868 120.915941
Pothole (chuck) 1.55 sq.m 6.2 m 25 cm 2.5 cm 130 13.88182 120.915921
Minor wornout surface 27.9 sq.m 130 13.88182 120.915921
Patching 0.5424 sq.m 113 cm 48 cm 135 13.882055 120.916232
136 13.882055 120.916232
Transverse Crack 6.2 l.m 6.2 m 8 cm 150 13.881785 120.915872
Longitudinal Crack 2.75 l.m 275 cm 3 cm 150 13.881785 120.915872
Transverse Crack 3.1 l.m 3.1 m 15 cm 2 cm 180 13.883044 120.917821
181 13.883044 120.917821
Bonifacio/E 193 13.883305 120.918215
Note: Legend: /E - End
1. The data is surveyed last March 2, 2022. /In - Intersection
2. The unit of measure l.m denotes linear meter. /Co - Corner
CONTACT US
GOVERNMENT DIRECTORY
Lemery Engineering Office,
Ilustre Ave., Lemery, Batangas
pmsgislemery@gmail.com